How to Check the Operating Status of Protective Relays

Aug 13, 2026 Leave a message

Visual On-Site Inspection
‌Appearance and Environment Check‌: Confirm the relay casing is free of damage or deformation and the glass cover is free of condensation; ensure the ambient temperature remains between 0°C and 40°C, with no signs of overheating, highly corrosive gases, or sources of strong electromagnetic interference.
‌Status Signal Verification‌: Ensure the power indicator is steadily lit; check that operation/alarm indicators are not abnormally lit; verify that signal relay flags have been properly reset; and confirm all indications match the current operating mode.
‌Mechanical and Circuit Inspection‌: Listen for abnormal sounds and smell for burning odors; check that all terminals are tight and free of overheating; ensure plug-in modules are fully inserted and locked; and verify that protection link/switch positions align with operational requirements.

 

Basic Electrical Parameter Measurement
‌Coil and Contact Resistance Check‌: Use a multimeter (resistance setting) to measure coil resistance and compare it with the product manual's standard values-excessive deviation indicates a broken coil strand or short circuit; measure contact resistance-normally close to 0Ω, whereas high resistance indicates contact oxidation or ablation.
‌Operating Power Supply Verification‌: Use a multimeter (voltage setting) to measure the coil supply voltage, ensuring it is at least 85% of the rated value and free from undervoltage or overvoltage fluctuations, thereby guaranteeing stable power supply to the relay.
‌Insulation Performance Test‌: After de-energizing, use a 500V megohmmeter to measure insulation resistance between circuits and between live parts and the casing; the value must be at least 10MΩ to rule out risks of leakage or short circuits.

 

Operational Characteristic and Function Verification
‌Pickup and Dropout Test‌: Gradually apply stepped voltage to the coil and record the pickup and dropout voltages; compare these with standard values ​​to ensure the operation logic meets design requirements and that there are no issues with sticking or delays. Contact Status Verification: When the coil is de-energized, the normally closed (NC) contacts must conduct reliably while the normally open (NO) contacts remain open; upon applying rated voltage to the coil, the NO contacts must close and the NC contacts must open, with the switching process free from sticking or binding.
Simulated Operating Condition Testing: A relay protection tester is used to simulate fault conditions to verify that deviations in relay operating values ​​and operating times relative to set values ​​remain within permissible limits; test results must be consistent across multiple trials under identical conditions, with no drift or intermittent operation.