NAHO Electric Power Technology Co., Ltd. is one of the leading manufacturers and suppliers of three-phase voltmeter in China. With a professional team, we are committed to providing high quality customized service and OEM&ODM service for global customers. Please rest assured to wholesale bulk premium products at competitive price from our factory. Also, quotation is available.
Three Phase Voltmeter NR900 – One Meter for Both 3P3W and 3P4W Voltage Monitoring
A Three Phase Voltmeter should not force you to stock two models for two wiring systems. At NAHO, we build the NR900 voltmeter so that one meter covers both 3-phase 4-wire and 3-phase 3-wire networks, and you choose the mode in the menu. Our team has been making power automation equipment since 1992, and we designed this meter for switchgear builders, system integrators and project buyers who need fewer part numbers and fewer wiring mistakes on site.
Ua · Ub · Uc
What We Built This Voltmeter to Do
One meter for two wiring systems.
The meter works in 3P4W and 3P3W modes. You set the mode with the "InS → nEt" parameter (n.34 for 3P4W, n.33 for 3P3W). That means one model number can serve different cabinet designs across your projects.
Phase voltage or line voltage on demand.
In 3P4W mode the meter reads phase voltage (Ua, Ub, Uc); in 3P3W mode it displays line voltage. The display can also be switched between Un (line-to-neutral) and UL (line-to-line), with an "N" or "L" indicator on the panel so the operator always knows what is being read.
All three phases on one screen.
Ua, Ub and Uc appear together in a single view, so an operator can compare phases at a glance instead of scrolling through pages.
Manual or automatic page flipping.
Voltage, digital input and digital output status each have their own page. Choose "Hand" to step through pages yourself, or "Auto" to let the meter rotate them.
LED or LCD, your choice.
We supply an LED display (code S) or an LCD display (code Y), so you can match the look and readability of your panels. LED brightness has three levels (E1 to E3) to suit cabinet lighting.
Direct, 3PT or 2PT Connection
The rated input is AC 100 V or 380 V. When your system voltage is higher, connect through external PTs:
Set the PT ratio (U.Pt, 1 to 9999) in the menu and the meter displays the primary-side value directly. Tell us your system voltage and PT ratio, and we will confirm the model and preset the ratio before shipment.
3P4W
Direct, or 3 PTs
Direct connection, or through 3 PTs
3P3W
Direct, or 2 PTs
Direct connection, or through 2 PTs
Optional I/O for Alarm, Status and Transmission
Where your project needs more than display, we can add optional modules:
For example, you can set an alarm to trip when a phase voltage falls under 200 V and reset at the recovery value you define, with adjustable pulse width and delay (0.0–99.9 s). Alarms can monitor Ua, Ub, Uc, any phase, Uab, Ubc, Uca, any line voltage, or a digital-input state. The analog output can transmit any single phase or line voltage; for instance, 0 V can map to 4 mA and 380 V to 20 mA.
Communication for SCADA and Control Panels
Modbus address
Baud rate
Modbus-RTU, on the rear
An RS485 port on the rear carries standard Modbus-RTU. Address is 1–247, baud rate 1.2k to 19.2k, and the data frame can be none, odd or even parity with 1 or 2 stop bits. Function codes 01H, 02H, 03H/04H, 05H, 06H and 10H are supported, and measured values are read as floating-point (big-endian ABCD). A symbol on the panel lights when the meter is communicating. Our team can share the register map during your inquiry.
Technical Data
Four sizes let you pick the cutout your existing panel already has, so installation needs only a standard cutout and the supplied mounting clamps.
Find What You Need Quickly
Switchgear and panel builders
Pick the size from the cutout table, tell us LED or LCD, and state your auxiliary supply. We will confirm the matching model.
System integrators and project buyers
Specify wiring (3P4W or 3P3W), whether you connect direct, 3PT or 2PT, and the I/O you need. We preset the PT ratio, so the meter arrives ready for your cabinet.
Distributors and agents
We supply the same meter in several sizes and display types, which lets you cover many customer requests from a limited range. Ask us about order quantities.
OEM and private label customers
We can discuss your logo and packaging requirements. Send us your artwork and target quantity.
Why Buyers Work With Us
Manufacturing electrical equipment
State Grid qualified supplier
Warranty from arrival of the goods
We have manufactured electrical equipment since 1992 and have been a State Grid qualified supplier since 2018. We have taken part in drafting national and energy-industry standards for protection equipment. For you, that means a factory with long experience in power systems, stable supply for repeat orders, and engineers who can answer your wiring questions in plain terms. We provide technical support and after-sales service, with a two-year warranty counted from arrival of the goods.

Before You Order
Please send us:
We preset the PT ratio, mode and I/O at the factory. The factory defaults are U.Pt = 1, nEt = n.34, Modbus address 1, 9600 baud, n.8.1, and password 0001. Output wiring must stay within the rated capacity.
Installation Notes From Our Team
Wire the meter in the same mode you set in the menu. If wiring and the "InS → nEt" setting do not match, the readings will be wrong. To switch between 3P3W and 3P4W, change both the terminal wiring and the menu setting. Check that the auxiliary supply is within AC/DC 85–265 V before power-on. If the meter shows wrong voltage, first confirm voltage is actually present and the PT ratio is correct. If it does not communicate, check RS485 wiring and the Addr, bAUd and dAtA settings.
Request a Quote
Send us your wiring, voltage, PT ratio, size and quantity. We will confirm the model and reply with a quotation. Lead time and minimum order quantity are confirmed per inquiry.
Hot Tags: three-phase voltmeter, China three-phase voltmeter manufacturers, suppliers, factory





